PROJECTS
Check out some of the projects we have worked on:
Maraetai Road, Tokoroa
This project involved approximately 460m of open trenching and Directional Drilling to install 3x 150mm, 1x 110mm and a 32mm power duct for an HV power upgrade. Once all duct was installed, we then Hauled 33kv and 11kv power cable through the power ducts.
Wiel 33KV Project – Wood Road, Waitao
This project involved approximately 1500M of Directional Drilling to install 3x 140mm & 63mm of power duct, once the duct was installed, we then hauled the power cable & reinstated the topsoil.